- Heat can cut power line capacity by nearly half at some Spanish hot spots.
- France showed the largest simulated shortfalls, ahead of Italy and Spain.
- Spain’s neighbors offered little backup, but France gained from its links.
- Conventional models missed overheating, so heat belongs in grid planning.
Hot weather does more than send air conditioners into overdrive. It also shrinks how much electricity power lines can safely carry. In a new simulation of Western Europe’s electricity system, that effect cut capacity on some stretches of Spanish lines to nearly half of their normal rating, and the modeled Spanish grid at times could not meet demand.
Published in Nature Energy, the study simulated heatwaves projected for 2026 through 2030 across eight countries. France fell short most, with unmet demand averaging 0.45% during the simulated heatwaves, followed by Italy at 0.18% and Spain, the detailed test case, at 0.05%. The other five countries, including Germany and the UK, showed no substantial shortfalls.
Spain’s neighbors offered little help in the tests, while France gained a great deal from its own connections, an uneven result that cuts against the idea of a shared safety net.
Heatwaves Shrink How Much Electricity Power Lines Can Carry
Engineers have long known that heat strains power systems, but measuring where and how badly has been hard. Existing tools either oversimplify the physics or run too slowly to test many scenarios. To fill that gap, the authors built a model that tracks three heat effects together: higher electricity demand, mostly from cooling; weaker output from power plants; and reduced capacity on the power lines themselves.
Line capacity is the sneakiest piece. Overhead lines are long metal wires that warm as current flows through them, much like a toaster coil. On a hot, still day, a line can reach its temperature limit, set at 90 degrees Celsius (194 degrees Fahrenheit) in the model, while carrying less than its usual maximum load. Weather also varies along a route, so the model split long lines into segments. One 130-kilometer (81-mile) line in northwestern Spain became eight pieces, each with its own local conditions.
Public grid, weather and electricity demand data fed the model. To build heatwaves for 2026 through 2030, the researchers took the extra heat recorded during real heatwaves in 2019, 2022 and 2024 and added it to projected ordinary days. Each of eight countries, Spain, Portugal, France, Italy, Germany, Belgium, the Netherlands and the UK, faced 480 simulated heatwave hours. These are what-if stress tests, not predictions of specific future heatwaves. Shortfall figures in this article are averages across those simulated hours.
Conventional Models Underestimate Power Grid Overheating
Spain’s grid served as the main test for comparing the new method with conventional ones. Conventional models allowed some simulated lines to run past the 90-degree limit, which made capacity look larger and shortfalls smaller than they were. A flat safety cushion that caps every line at 70% of its rating, another shortcut used in European grid modeling, still let some lines overheat, since heat does not hit every stretch equally.
Instead, the researchers’ approach checks line temperatures and power flows against each other, round after round, until the numbers settle. It kept lines under the limit and landed within 1% of a slower, exhaustive version on average, while running much faster. That speed made hundreds of scenarios practical.
Rising Demand Worsens Spain’s Power Grid Shortfalls
Two what-if changes were tested in Spain. Electricity demand growing 1% to 3% a year from 2025, reflecting AI infrastructure, electric heating and cooling, and electric vehicles, increased shortfalls in the model. Batteries helped only in part: raising their starting charge from empty to full cut shortfalls, but the gains shrank at higher charge levels. Even full batteries could not make up for greater cooling demand, weaker power plants and reduced line capacity all hitting at once. That test used only batteries already listed in the public data, so it does not show what newly built storage could do.
Neighbors Gave Spain’s Power Grid Little Heatwave Relief
Linking grids is supposed to let a struggling country borrow power from its neighbors. For Spain, that barely helped. Connecting it with Portugal’s or France’s left its average shortfall unchanged. The authors say that fits with neighbors facing heat stress of their own and having little spare power to deliver.
France saw the opposite. Connected to any one of Spain, Italy or the UK, its average shortfall fell sharply, to 0.02% or less, so France gained even from a link with Spain, while Spain gained little from France. In plain terms, a neighbor helps only if it has power to spare on the day of the heatwave and lines able to carry it across the border.
Three fixes emerge from the paper: asking customers to cut back during crunch times, upgrading the wires on vulnerable lines, and placing batteries near weak spots. Each has trade-offs, from customer inconvenience to the money and construction time that line upgrades require, and batteries help only when well placed and backed by enough power plants and lines.
Planning models that treat power lines as having one fixed capacity miss what heat takes away, and in the simulations Spain’s neighbors offered little cover. Heat belongs in grid planning now, because the heatwaves modeled here fall between 2026 and 2030.
Disclaimer: This article summarizes one simulation study and is not professional advice.
Paper Notes
Limitations
The authors describe their results as near-term, scenario-based indicators of vulnerability, not firm predictions of blackouts in any one country. The model relies on public grid data, including the storage locations and capacities listed there, and uses a simplified version of each national network. Real grid operators know more about their own networks, storage plans and operating rules, and those details could change the numbers. Future line upgrades, new power plants and storage expansion are not modeled because public data cannot reliably predict them. Climate and demand projections carry uncertainty, since weather projections will shift as climate models improve and cooling demand depends on future building efficiency and air conditioner adoption. The faster calculation method was checked against a more exhaustive version of the same model, not against real-world measurements of line temperatures during actual heatwaves, so errors in the underlying physics or input data could carry into the results. The results are descriptive summaries of simulated scenarios, and the authors ran no statistical hypothesis tests.
Funding and Disclosures
According to the paper, author Srinivasan Keshav is supported by a chair established by R. Sansom. Authors Enming Liang and Minghua Chen are supported by a General Research Fund and a Collaborative Research Fund from the Research Grants Council of Hong Kong, and Minghua Chen is also supported by a Start-up Research Grant from The Chinese University of Hong Kong, Shenzhen. The authors declare no competing interests.
Publication Details
Title: Heatwave-induced capacity bottlenecks in European electricity grids. Authors: Enming Liang (Department of Data Science, City University of Hong Kong), Minghua Chen (City University of Hong Kong, and School of Data Science, The Chinese University of Hong Kong, Shenzhen), and Srinivasan Keshav (Department of Computer Science and Technology, University of Cambridge). Journal: Nature Energy. Received October 25, 2024; accepted September 19, 2026; published online October 22, 2026. DOI: https://doi.org/10.1038/s41560-026-02151-1. The paper is open access under a Creative Commons Attribution 4.0 International License. Correspondence: Minghua Chen or Srinivasan Keshav.